New washing facility

New washing facility

Stacke Hydraulik has installed a new washing facility for cylinder pipes. The facility is built to thoroughly clean pipes up to five meters long inside and out. The washing takes place just before final assembly, to achieve the highest possible purity. With this, we ensure a high quality and a long service life of our products.

}